Project Description: Prologic Construction Ltd. successfully completed a comprehensive renovation of the Leduc Composite lab, transforming the space to meet modern educational and operational standards. The project involved the complete removal of all existing components, followed by the installation of new infrastructure, including gas lines, water lines, and custom millwork.
A portion of the floor was removed to connect to existing services, ensuring that gas and electrical supplies were effectively routed to each workstation. Once the renovations were finalized, new flooring was installed, and all millwork was completed alongside the necessary mechanical work, resulting in a state-of-the-art laboratory space.