Project Description: Prologic Construction Ltd. undertook a critical renovation project involving the removal of a concrete slab to investigate a potential leak in the cooling system at the Jasper Recreation Facility Arena.
The process involved carefully excavating contaminated soil and transporting it offsite for safe disposal. After preparing the subgrade, new heating and cooling lines, along with insulation, were installed before pouring a new concrete pad.
Additionally, all boards and glass were replaced, revitalizing the structure and ensuring its operational integrity.